Blog
Beach Pool Steelwork complete
The Plumbing begins.
Excavation of Beach Pool
Excavation now begins on the Beach Pool.
Steel Completion on Lap Pool
Approximately 900 bars of steel have been positioned.
Prep before steelwork
The excavation is almost complete. 40 metres of gravel is now deposited and levelled onto the floor and ramp.