Build Costs
9 April 2026
Above-ground or partially out-of-ground concrete pools in Brisbane typically cost $70,000–$120,000+, more than a standard inground build of the same size. The extra cost comes from formwork, retaining structures, and…
Read More →
Build Costs
9 April 2026
A concrete pool in Brisbane takes 8–16 weeks from excavation to handover. Simple designs on straightforward sites are closer to 8–12 weeks. Complex custom builds or difficult sites can push…
Read More →
Build Costs
9 April 2026
A custom concrete pool in Brisbane typically costs between $60,000 and $120,000+, depending on size, site conditions, and finishes. A standard 7×3m family pool with quality inclusions sits around $76,000–$103,000.…
Read More →